Factory-Direct Bulk Door Solutions for Global Contractors
Door Supply Built for Construction Timelines
Contractors don't need a catalog — they need a reliable supply partner who understands construction schedules, building codes, and cost pressures. Delays in door delivery cascade through every downstream trade.
Jusen serves general contractors, construction managers, and procurement teams on projects from 100-unit apartments to 1,000-room hotels, with dedicated project managers, phased delivery, and factory-direct pricing.
Door Types for Construction Projects

Fire-Rated Doors
20/45/60/90-minute rated assemblies. Steel, wood composite, and aluminum options. UL listed and CE marked.

Interior Passage Doors
Solid core and hollow core wood doors for residential and commercial interiors. Primed, painted, or veneer finished.

Commercial Entry Systems
Aluminum storefront doors, automatic sliding doors, and revolving door assemblies.

Acoustic & STC-Rated Doors
STC 35-52 acoustic door assemblies for hotels, apartments, and offices.

Security & Utility Doors
Heavy-gauge steel doors for mechanical rooms, electrical closets, and secure storage.

ADA & Accessibility Compliant
Wide-clearance doors, low-threshold assemblies, lever hardware, and automatic openers.
Why Contractors Choose Jusen
98% On-Time Delivery Rate
We understand that late doors delay entire projects. Our production planning aligns to your construction schedule.
Milestone-Based Shipping
Don't receive 2,000 doors at once. We ship in phases aligned to floor completion, reducing storage needs and damage risk.
Direct Pricing, No Middlemen
Buy directly from the manufacturer. Eliminate distributor markups of 15-30%. Volume discounts for 500+ units.
Full Code Compliance Documentation
Every fire-rated door ships with certification labels, test reports, and installation instructions ready for inspector review.
Project Supply Specifications
| Parameter | Details |
|---|---|
| MOQ per Door Type | 100 units (50 for mixed-type projects) |
| Production Capacity | 15,000 doors/month |
| Standard Lead Time | 45-60 days after sample approval |
| Rush Order Capability | 30-day expedited production |
| Packaging | Individual carton + palletized, room-number labeling |
| Shipping Terms | FOB, CIF, DDP available |
| Quality Inspection | AQL 2.5 sampling, third-party inspection welcomed |
Project Supply Workflow
Door Schedule Review
Submit architectural door schedule. We cross-reference types, sizes, ratings, and quantities.
Quotation & Samples
Detailed quotation within 48 hours. Samples produced and shipped within 15 days.
Production Planning
Production scheduled to match your construction milestones. Phased manufacturing.
QC & Shipment
Pre-shipment inspection. Room-number labeling. Container loading photos sent.
Site Support
Installation guides included. Remote support and on-site supervisor for large projects.
Construction Project References

450-Unit Apartment Complex — Toronto, Canada
Scope: 1,800 interior + 450 suite entry + 120 fire-rated doors. Result: All phases delivered on schedule, 100% labeling accuracy.

Mixed-Use Development — Riyadh, Saudi Arabia
Scope: 600 hotel + 300 office + 200 retail + 150 garage doors. Result: Full package delivered in 4 shipments, all SASO passed.

Government Office Building — Nairobi, Kenya
Scope: 350 wood office + 80 fire-rated + 40 security doors. Result: 22% below local quotes, DDP delivery to site.
What Our Clients Say
“Jusen's phased delivery matched our floor-by-floor schedule perfectly. Not a single door was mislabeled across 1,800 units.”
“We switched to Jusen after our previous supplier missed dates. Jusen hit every milestone and pricing was 18% lower.”
“The fire door certification documentation was impeccable. Our inspector approved everything on first review.”
Frequently Asked Questions
Can you supply doors for projects in my country?
What happens if doors arrive damaged during shipping?
Do you label doors by room number and floor?
Can you work with our existing architect door schedule?
What payment terms do you offer?
How do you handle change orders mid-production?
Related Product Categories
Each solution maps to specific product lines — follow a category to view specifications, available configurations and factory-direct pricing.
Planning a Construction Project? Let's Talk Doors.
Send us your door schedule and receive a detailed quotation with lead times, certifications, and phased delivery options within 48 hours.