Quality Control

Factory · Quality Control

Strict Quality Control Before Shipment

Three inspection stages — incoming material, in-process and final — recorded for every order before it leaves the factory.
✓ ISO 9001 quality management system✓ Inspection records kept by order number✓ Third-party inspection accepted
20+
Years Manufacturing
Since 2006
150+
Skilled Employees
In-house production team
150k+
Units Per Year
150,000–200,000 sets
60+
Export Markets
Across five continents
Inspection System

Three Inspection Stages

Every order passes the same three checkpoints. Each stage has its own checklist and a record kept with the order file.

01

Incoming Material Inspection

Materials checked against the purchase specification before they are released to production.

02

Production Inspection

Dimensions, surface and assembly checked at each station and by the quality team patrolling the line.

03

Final Inspection

Appearance, function and packaging checked against the order before shipment.

Stage 01

Incoming Material Inspection

Every lot of timber, aluminum profile, steel sheet, glass and hardware is checked when it arrives. Only released material enters production.

Material Checking

Material Checking

Timber: moisture content, species, grade, defects, dimensions. Aluminum: alloy/temper certificate, wall thickness, coating. Steel: thickness and surface. Glass and hardware: type, size, visual defects.

Specification Verification

Specification Verification

Lot compared with the purchase order and drawing. Supplier test certificates filed. Non-conforming lots quarantined and returned.

Stage 02

Production Inspection

Operators check their own work at each station and the quality team patrols the line. First pieces of each batch are approved before the run continues.

Dimension Checking

Dimension Checking

Width, height, thickness and diagonal against the drawing; rebate, groove and hardware positions; frame and sash fit.

Surface Inspection

Surface Inspection

Sanding quality before priming; coating coverage, color and gloss against the approved sample; scratches, dents and contamination.

Assembly Checking

Assembly Checking

Squareness and gap width; seal and glazing fit; hinge, lock and handle alignment and smooth operation.

Stage 03

Final Inspection Before Shipment

Finished products are inspected against the order before packing. Customers or third-party agencies are welcome to attend.

Appearance Check

Appearance Check

Overall finish and color consistency across the batch; veneer and grain matching; edge and corner quality; clean hardware.

Function Test

Function Test

Opening/closing force, latch and lock operation; sliding/folding movement; hinge alignment; seal contact and closing gap.

Packaging Inspection

Packaging Inspection

Protection: corner guards, foam, film and crate condition; labels match packing list; quantity counted before loading.

Browse Products

Related Product Categories

Each solution maps to specific product lines — follow a category to view specifications, available configurations and factory-direct pricing.

Certifications

Quality Certifications & Standards

Independent certifications that support your sourcing and project compliance requirements.

ISO 9001:2015Quality management system
ISO 14001Environmental management
CE MarkingEN 16034 fire & building doors
UL ListedUS / Canada fire-rated assemblies
CCCF / GBChina fire certification
Get In Touch

Request Our Inspection Checklist

We can share the inspection checklist and a sample inspection report for the product type you are sourcing, so you know exactly what is checked before your order ships.

Scroll to Top
Chat on WhatsApp Send Inquiry